Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
2024 hangzhou polytech PVC PLASTIC ROOF MACHINE WITH POWER SAVING
Raw material & Final product:
Raw material & formulation |
Bottom layer: PVC powder, CaCO3, CPE, PE-WAX, Stearic acid , Compound stabilizer ,ACR, paraffin. |
Description final product & Output |
Two layers PVC+ASA Co-extrusion Glazed tile; |
Final product |
Main tile:1set |
Machine list:
No. |
Machine |
Qty. |
|
1 |
Screw loader for extruder |
1set |
Glazed tile extrusion line |
2 |
Conical twin-screw extruder(PVC) |
1set |
|
3 |
Vacuum loader and drying hopper |
1set |
|
4 |
Single screw extruder(ASA) |
1set |
|
5 |
Extrusion mould and distributor |
1set |
|
6 |
Embossing roller |
1set |
|
7 |
Temperature controller |
1set |
|
8 |
Glazed-tile forming machine |
1set |
|
9 |
Cutter |
1set |
|
10 |
Stacker |
1set |
|
11 |
Ridge tile Oven |
1set |
|
12 |
Ridge tile Forming machine and ridge tile mould |
4set |
|
|
|
|
|
13 |
Screw loader for Mixer |
1set |
Auxiliary equipment |
14 |
Mixer unit |
1set |
|
15 |
Crusher |
1set |
|
16 |
Pulverizer |
1set |
1,Q:How to solve the problem about material leakage of high mixer quickly?
A:Replace the seal gasket or check the cylinder distance whether it is enough .
2,Q:why the low-mixer is always burned?
A:The mixture exceeds the rated capacity, causing the motor to overload.
3,Q:How to adjust the space of the screw?
A:Log in Polytech official website, authorized to download the video tutorial.
4,Q:How to solve the the ASA coating problem?
A:Many reasons ,such as temperature, formulation, start-up speed etc.
5,Q:Why the material Burnt?
A:Many reasons, such as high heating temperature, heating preservation time is too long.
6, Q:Why the ASA is covering on the bottom?
A:Many reasons ,such as temperature, formulation, start-up speed does not match.
7, Q:Asymmetrical ASA2/4 area covering?
A:Many reasons ,such as temperature, formulation, start-up speed does not match.
8,Q:How to adjust the dislocation of glazed tile module?
A:By adjusting tooth on the dynamic column to achieve the right location of module.
9, Q:Why Shaping mould two side speed is not synchronization?
A:Two side shaping module is not synchronized.
10,Q:Why the Cutter machine does not move?
A:Replace the sliding bearing seat under rack or moving cylinder.