Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PC PE Wave Roofing Making Machine Corrugated Transparent Roofing Tile Sheet Production Extrusion Line
Specifications:
specification of the tile (Can be customized according to design) |
width:880/1040mm wave pitch:160mm wave distance:220mm height:30mm thickness:1~3mm |
main extruder |
SJZS-80/156+ SJ50/30 |
max output |
350kg/h+50kg/h |
max traction force |
20KN |
speed |
300~5000mm/min |
Applications:
The plastic roofing tile extrusion machine is mainly used in the production of plastic glazed tile .
This plastic glazed tile compare with ordinary plastic tile,glazed tile has more beautiful appearance,better quality, strong
durability and some special features,such as anti-fire, anti-corrosion, anti-freeze, good weather resistance and color ret
-ention,etc.
Features of PVC roofing tile :
1. Anti-corrosion;
2. Fire resistan;
3. Weather resistance: UV agent mixed in the PVC compound can resist the damage of ultraviolet ray.
4. Impact resistance: tensile and hardly breakable
5. Low noise
6. It does not contain asbestos with no carcinogen released
1.Our company will provide relevant information on various technology and business consulted by customers. If clients
want to visit our company, we will offer all they need for convenience.
2.After signing contract, company designs groundsill installation chart for water, electricity and gas of equipment basing
on real condition and customers' requirements and provides detail order list and matching manufacturer for reference
for customer.
3.After equipment arrival, our service personnel will arrive at posted locale for installation, debugging, training and tech
-nology transfer till customers can operate independently and manufactures eligible product. Service personnel have to
arrive at customer's locale in time when we provide service for client again.